Serdang Hospital (Malaysia)
This Air Conditioning Plant of
this Hospital
incorporates an STL-AC.00-400
|
Serdang
|
|||||||||||||||||||
|
|
Objective To reduce the electrical bill it was decided to
install a Thermal Energy Storage Systems (STL). The strategy of use is partial
stor To assist with project design Cristopia engineers performed simulation
studies using Cristopia’s “Stockaid 2000” & simulation
software. The purpose of this
simulation was to check the discharge rate capability in the design
specifications mentioned below as par ARI Standard 900
( 4.3°C leaving temperature and
9.5 °C return temperature). Using the “Stockaid 2000” simulation software Cristopia technical staff can provide the most appropriate design answers to consulting engineer’s questions. |
||||||||||||||||||
|
Technical Data
|
Characteristics The plant consists of 2 STL tanks of 200 m³, 2 base chillers (400 Tons) and 2 brine chillers (374 Tons). The STL will supply 23% of the cooling demand and will enable to shift electrical consumption from on- peak to off-peak period. |
||||||||||||||||||
|
Technical Advantages
|
Projects Credits Customer: SERDANG HOSPITAL At |
||||||||||||||||||
|
Financial Advantages
|
|||||||||||||||||||